Prime Minister Narendra Modi Tuesday as soon as once more known as up Uttarakhand Chief Minister Pushkar Singh Dhami and took inventory of the operation underway in Uttarkashi for the rescue of 41 employees trapped within the collapsed Silkyara tunnel.
In the course of the dialog, PM Modi was briefed in regards to the profitable laying of a six-inch pipe by means of which meals and different necessities like medicines might be despatched. It should additionally be capable to enhance air flow for these trapped inside.
In a publish on X, previously often known as Twitter, Dhami stated he knowledgeable PM Modi in regards to the dialog with trapped employees with the assistance of an endoscopic digicam that was despatched in by means of the choice six-inch meals pipe.
Associated Articles
In the course of the name, PM Modi emphasised that the evacuation of all 41 employees needs to be the highest precedence.
आदरणीय प्रधानमंत्री श्री @narendramodi जी ने आज पुनः फोन कर सिलक्यारा, उत्तरकाशी में निर्माणाधीन सुरंग में फँसे श्रमिकों के राहत एवं बचाव कार्यों की जानकारी ली।
इस अवसर पर माननीय प्रधानमंत्री जी को 6 इंच व्यास की पाइप लाइन के सफलता पूर्वक मलबे के आरपार किए जाने एवं इसके माध्यम…
— Pushkar Singh Dhami (@pushkardhami) November 21, 2023
PM Modi spoke to Dhami on Monday too. In the course of the dialog, the Prime Minister stated it was essential to sustain the morale of the trapped employees.
The pipeline improvement, on Monday, got here hours after PM Modi known as up Dhami to take inventory of the rescue operation.
Earlier on Tuesday, the primary visuals of employees trapped contained in the collapsed tunnel in Uttarkashi. The event got here a day after rescuers pushed a six-inch-wide pipeline by means of the rubble of the Silkyara tunnel.
Within the video, which was additionally shared by Dhami, the employees had been seen sporting yellow and white helmets and had been seen receiving meals objects despatched to them by means of the pipeline and speaking to one another.
सिलक्यारा, उत्तरकाशी में निर्माणाधीन सुरंग के अंदर फँसे श्रमिकों से पहली बार एंडोस्कोपिक फ्लेक्सी कैमरे के माध्यम से बातचीत कर उनका कुशलक्षेम पूछा गया। सभी श्रमिक बंधु पूरी तरह सुरक्षित हैं। pic.twitter.com/vcr28EHx8g
— Pushkar Singh Dhami (@pushkardhami) November 21, 2023
By this six-inch various pipeline, which has been known as “first breakthrough” on the website, sizzling Khichdi was despatched to the stranded employees for the primary time since they had been trapped on 12 November.
The under-construction tunnel from Silkyara to Barkot reportedly collapsed attributable to a muck falling within the 60-metre stretch on the Silkyara aspect, trapping 41 labourers. As per the federal government, the labourers are trapped within the 2 km-built tunnel portion, which is full together with concrete work that gives security to the employees.
Electrical energy and water can be found within the portion of the tunnel and employees had been earlier supplied meals objects and medicines by means of 4-inch compressor pipeline.
With inputs from businesses